Skip to content

Plotting

Creating a plot

  1. In the field table, select an X field (radio button) and one or more Y fields (checkboxes)
  2. Click Plot to open a new XY plot
  3. Click + to add traces to an existing plot without replacing it

Double-clicking a run in the run table opens a plot automatically using the previously selected fields.

Overlaying traces from multiple runs

With a plot already open, select a different run and click + to add its traces to the current plot. Each run's traces are shown in a distinct color.

Live plots

Selecting an acquiring run starts a live plot that updates in real time as new data points arrive. The plot freezes automatically when the run completes.

Note

Live data is streamed via SSE (Server-Sent Events) through the Tiled server. The connection indicator in the toolbar shows the current status.